← All projects

Production · 2023

Frederikssund Culture and Harbour Bath
CASE HERO - FREDERIKSSUND HARBOUR BATH
01 // Project data

Client

Frederikssund Municipality

Main contractor

Per Aarsleff A/S

Sejerslev

Subcontractor - production and delivery of steel structures

Execution period

Q2 + Q3 2023

Steel quantity

Approx. 50 tonnes

Execution class

EXC2 acc. to DS/EN 1090-2

Approx. 50 tonnes

Steel structure

EXC2

Acc. to DS/EN 1090-2

Steel delivery

Production and delivery

Marine environment

Corrosion-protected execution

02 // Project description & scope

Sejerslev produced and delivered the complete steel structure for Frederikssund Culture and Harbour Bath as a subcontractor to Per Aarsleff A/S.

The delivery comprised approx. 50 tonnes of steel structures and covered production, delivery, coordination and quality assurance.

03 // Technical execution

The steel contract included:

  • Load-bearing columns and beams
  • Bridge and walkway structures
  • Steel stairs and access structures
  • Railings and safety structures
  • Bespoke brackets and connection details

All elements were produced and delivered by Sejerslev.

Steel for an exposed environment

The location close to the water placed demands on corrosion protection, detailing and execution.

The steel structures were executed with hot-dip galvanising and a subsequent coating system suited to exposed environments.

04 // Quality & documentation

The delivery was carried out in connection with a complex construction environment with limited access and many simultaneous activities.

The work comprised production planning, logistics management, coordination with other trades, tolerance handling and documented quality assurance and material traceability.

06 // Photo documentation
Frederikssund Culture and Harbour Bath with footbridge seen from land
Curved walkway along the timber slats of the harbour bath
Galvanised guardrail by the timber slats of the harbour bath
The steel structure at the harbour bath during construction
Hot-dip galvanised steel beam with connection on the construction site at Frederikssund Harbour
View of the basin through the steel frame in the harbour bath

Scandlines - PR24 →