Steel structures

E45 - Project 6070.204
CASE HERO - E45 PROJECT PHOTO
01 // Project data

Project

E45 motorway extension

Project no.

6070.204

Delivery

Complete end-to-end steel delivery

Scope

Up to 200 tonnes of steel

Execution

DS/EN 1090-2 EXC3

Up to 200 tonnes

Total steel delivery

Approx. 140 tonnes

Steel structures for bracing and supporting sheet pile enclosures

EXC3

Acc. to DS/EN 1090-2

End-to-end

From engineering basis to fully installed steel structure

02 // Project description & scope

In connection with the extension of the E45 motorway, Sejerslev undertook an extensive and technically demanding steel delivery of up to 200 tonnes. The project comprised a wide range of specialised steel, welding and installation works in connection with the establishment of new excavations, sheet pile enclosures and temporary bracing structures.

Sejerslev’s scope of responsibility extended far beyond traditional steel production and installation. The delivery covered the entire value chain – from technical clarification, structural optimisation and coordination with consulting engineers to material procurement, machining, specialised fabrication, welding, quality documentation, logistics and final installation on site.

In addition to the larger steel structures, the project included the installation of more than 300 embedded plates, the installation of 235 anchor bars with individually adapted relief beams, nearly 9,200 metres of watertight welding of sheet pile interlocks, as well as extensive precision cutting and adaptation of steel structures directly on the construction site.

The complexity of the project was further underlined by the fact that a significant part of the work had to be carried out beneath and in the immediate vicinity of an active motorway, where considerations of progress, access conditions and coordination with the other contracts placed particular demands on planning and execution.

At the same time, Sejerslev participated as an active technical and operational partner in the execution of the project, contributing continuously to work and schedule planning, proposals for structural solutions and flexible staffing.

Construction site at the E45 with sheet pile enclosures being established
03 // Technical execution

Adapted to the actual conditions on site

A central part of the project comprised approx. 140 tonnes of steel structures for bracing and supporting the sheet pile enclosures.

During the technical planning, Sejerslev identified a significant challenge in the original design basis. The engineered structure did not sufficiently account for the geometric tolerances and positional deviations that naturally occur when sheet piles are driven.

This meant that the steel structures could not be fabricated solely according to the theoretical geometry, but had to be adaptable to the actual position and variations of the sheet piling on site.

In close technical dialogue with the project’s consulting engineers, and based on the necessary structural calculations, Sejerslev actively contributed to a comprehensive re-engineering of approx. 140 tonnes of steel structure.

The solution was developed with a focus on structural function, suitability for production and practical installation. This created coherence between the engineering design basis and the actual execution conditions – a decisive prerequisite for an efficient execution of the steelworks.

Large bracing structures beneath an active motorway

Among the project’s most extensive deliveries was the establishment of large temporary bracing structures built from HEM700 steel beams and CHS Ø406 mm cross-bracing tubes.

The structures were established in three levels and served to provide the necessary bracing of the sheet pile enclosures during the civil works.

The work was carried out beneath an active motorway, which placed considerable demands on installation planning, access conditions, material handling and coordination with the rest of the construction site.

The large dimensions and structural geometries required precise adaptation and a carefully planned installation process, in which the individual steel elements had to be fitted into the structures under the existing space constraints.

Sejerslev managed the necessary material handling itself and provided, among other things, its own wheel loader for handling and internal transport of the heavy steel structures on site.

Custom-made anchor and relief structures

As part of the establishment and bracing of the sheet pile enclosures, Sejerslev delivered and installed 235 anchor bars with associated, individually adapted relief beams.

Each relief beam had to be adapted to the specific geometric conditions in order to ensure correct load transfer from the anchor bars to the rest of the structure.

Where the anchor bars were passed through the sheet pile walls, Sejerslev developed and executed specially adapted closure details with a focus on waterproofing around the penetrations.

The work combined custom fabrication, precise adaptation and site welding, and placed considerable demands on the interaction between the load-bearing capacity of the structures, the actual geometry of the sheet piling and the necessary sealing solutions.

Bracing structure with CHS tubes and HEM beams beneath the bridge deck
Welded joint between HEM beam and CHS cross-bracing tube

Extensive welding works and waterproofing of sheet piling

A significant part of Sejerslev’s contract consisted of waterproofing the sheet pile enclosures by welding the vertical sheet pile interlocks.

In total, nearly 9,200 linear metres of site welding were carried out in order to establish watertight joints between the individual sheet pile profiles.

The work was carried out directly on the construction site and comprised long, continuous weld runs under varying access and working conditions.

The scale of the task placed considerable demands on staffing, welding capacity, quality control and continuous production planning.

Sejerslev’s experience with specialised welding and major infrastructure projects made it possible to plan and execute the work as an integrated part of the overall civil works.

Precision cutting and adaptation directly on site

In addition to the factory-fabricated steel delivery, Sejerslev carried out extensive cutting and adaptation works directly in the established excavations.

The work included precision cutting of more than 1,000 holes in steel structures and sheet piling for the passage of reinforcement bars.

The holes had to be positioned and executed with regard to the actual conditions on site, which placed particular demands on accuracy and practical execution.

In addition, Sejerslev carried out the trimming of nearly 1,000 linear metres of sheet piling, where the sheet pile walls were cut to the specified final level heights.

This part of the contract required both a precise surveying basis and flexible execution, as the work had to be adapted to the progress of the other civil engineering activities.

Embedded plates and steel superstructures

As part of the overall contract, Sejerslev delivered, installed and welded more than 300 embedded plates for the various excavations.

The work comprised precise positioning, adaptation and fixing of the individual steel parts in interaction with the reinforcement and concrete works.

In addition, Sejerslev delivered and installed approx. 40 metres of steel superstructure (sheet pile heads), which formed part of the project’s overall steel structures.

The many different steel parts and installation tasks required continuous coordination with the other contracts and a production setup that could quickly adapt to changes in the needs of the construction site.

HEM waler beams along the sheet pile wall in the excavation
Driven sheet pile profiles with precision-cut holes along the E45

Specialised production of driving heads in 180 mm steel

A particularly technically demanding part of the delivery comprised the development and manufacture of three custom-designed driving heads for the installation of the project’s very large and long sheet pile profiles.

The driving heads were custom-made for the contractor’s driving equipment and had to be adapted to the specific hammer as well as the considerable mechanical impacts the structures are subjected to during the driving process.

The structures were manufactured from steel plates with a thickness of up to 180 mm and built up as heavy, welded-up special structures.

The great material thicknesses placed particular demands on welding procedures, heat input and control of the thermal effects during manufacture.

Prior to welding, the material was preheated to approx. 150 °C. After welding, the structures were heat-treated at approx. 580 °C in order to reduce welding-related residual stresses.

The manufacture thus required a combination of advanced materials understanding, specialised welding technique and the capacity to handle exceptionally heavy steel structures.

The driving heads are an example of Sejerslev’s ability to develop and manufacture customer-specific solutions for tasks where conventional standard components are not sufficient.

Produced at Sejerslev

The extensive steel structures were manufactured at Sejerslev’s own production facilities, where modern machine technology is combined with specialised craftsmanship.

Production included CNC plasma cutting, automatic sawing, assembly and adaptation of steel structures, as well as both robot-based and manual welding.

Sejerslev’s own CLOOS welding robot was used for the structures and welding tasks suited to automated production, while complex geometries, heavy material thicknesses and specially adapted parts were handled through manual specialised production.

The overall production capacity made it possible to handle both larger series of steel parts, heavy structures and one-off special components within the same contract.

With technical clarification, machining, welding and quality control gathered in-house, Sejerslev could ensure close coordination between engineering and production while responding quickly to changes in the project’s execution.

Active participation in planning and project management

Sejerslev’s role on the E45 project comprised not only production and execution, but also active participation in the ongoing planning of the contract’s performance.

Throughout the course of the project, Sejerslev contributed to the preparation and adjustment of work and time schedules as input to the main contractor’s overall production planning.

This included coordination of production sequences, installation activities, access conditions and the necessary resources, so that the steelworks could be fitted into the other civil engineering activities.

The close involvement made it possible to identify execution-related challenges at an early stage and turn them into concrete technical and operational solutions.

Site welding of cross-bracing tube in the sheet pile enclosure
Sheet pile enclosure with reinforcement being prepared

Flexible execution under time pressure

Major infrastructure projects are characterised by complex dependencies between many different contracts, where delays in one activity can quickly affect the overall schedule.

On the E45 project, Sejerslev has on several occasions helped to recover delays from other parts of the project through flexible planning and rapid changeover.

This has been achieved, among other things, through rapid changeover of production, flexible resource planning and the mobilisation of employees for both night and weekend work.

With direct access to its own production facilities, specialised welders and installation personnel, Sejerslev has been able to respond at short notice whenever the project’s progress required an extraordinary effort.

This flexibility has been a central element of Sejerslev’s delivery and has contributed to critical work activities being completed, even when prerequisites and schedules changed along the way.

The project thus demonstrates Sejerslev’s strength as a technical and operational partner that does not merely deliver steel structures according to the drawing material, but actively contributes to getting complex civil engineering projects completed – from the first technical challenge to the final weld on site.

04 // Quality & documentation

The delivery was executed in accordance with the project’s applicable requirements for steel structures and DS/EN 1090-2 EXC3.

Quality assurance included qualified welding procedures and welders, material documentation, traceability, quality control and relevant NDT.

The documentation followed the steel throughout the entire process - from raw material and production to the finished structure.

The sheet pile enclosure beneath the bridge seen from the excavation
Welding of bracing structure in the excavation
05 // Result & relevance

One complete delivery

The E45 project shows the breadth of Sejerslev’s delivery: from technical clarification and engineering to in-house machining, welding, quality management, logistics and installation.

The same team that helped adapt the structure to the actual execution conditions subsequently carried the solution through production and on to final installation on site.